北条麻妃在线一区二区,男生插女生下面那个视频,亚洲午夜精品一区三区五区,超短裙嫩模白浆高潮在线

400-0302-595
安貝斯控制臺
首頁 > Industry hotspots
Anlps supports Shaoxing converter station
Time:2022-04-13 14:16:16Source:Anlpsorder

Recently, the Shaoxing converter station completed its 6th annual comprehensive maintenance, laying a solid foundation for ensuring power supply during this summer's peak electricity consumption period in Zhejiang and the Hangzhou Asian Games.

Zhejiang is a province with high energy consumption and low resources, and foreign electricity accounts for more than one-third of the highest load in the province. Adding to the key tasks of ensuring electricity supply during the Hangzhou Asian Games and summer peak season, the task of ensuring electricity supply in Zhejiang this summer has become even more challenging. In this annual maintenance, State Grid Zhejiang Ultra High Voltage Company, based on daily operation and maintenance experience and anti accident measures investigation, carried out maintenance on new equipment such as converter transformer lifting seats installed in Shaoxing converter station in recent years. The operation and maintenance personnel of State Grid Zhejiang Ultra High Voltage Company have installed 70 visible light cameras in the DC field and AC filter field, and connected them to the panoramic video fusion system of the converter station to improve the information perception ability of the system. The panoramic video fusion system initially has four functions: self perception and digital expression, equipment status analysis and diagnosis, accident response, and intelligent control, which can help improve the efficiency of operation and inspection.

The Shaoxing converter station is a ± 800 kV Lingshao DC receiving end converter station, which was put into operation in August 2016. The project starts from Lingzhou Converter Station in Yinchuan, Ningxia, passes through 6 provinces (regions), and ends at Shaoxing Converter Station in Zhuji, Zhejiang. The total length of the line is 1720 kilometers. As the main artery of the "West East Power Transmission", the Lingshao DC project has maintained stable operation with a large load of 7200 megawatts for a long time, continuously sending wind and solar power from thousands of miles away from the Ningxia energy base to Zhejiang, with a maximum daily power transmission of 160 million kilowatt hours, making the vision of "coal flowing from the air and electricity coming from afar" a reality.

As one of the first pilot projects for digital converter stations in China, State Grid Zhejiang Electric Power has applied new technologies such as the Internet of Things, artificial intelligence, 3D modeling, and Beidou positioning at the Shaoxing converter station, integrating automated collection of equipment monitoring data to achieve remote intelligent inspection of equipment, centralized monitoring of data, and automatic push of fault handling strategies. The application of new technologies has enhanced the ability of operation and inspection personnel to control equipment, ensuring the long-term safe and stable operation of the converter station.

安貝斯

Based on the concept of the "West East Power Transmission" main artery of Shaoxing converter station, and in combination with the analysis of the informationization status required by the control center, Ambes participated in the construction of the main control room, laying a solid foundation for the informationization construction of the command center, promoting the later development to break through institutional and mechanistic bottlenecks, improving the policy support system for expanding domestic demand, and substantially implementing the expansion of domestic demand. On the LED screen in the main control room, the digital converter station panoramic video fusion system is running. The system can display visible light images of the entire station equipment in a single image, synchronously displaying operating condition information such as infrared temperature measurement data of the converter transformer square, DC field, and converter valve.

Due to the shift in annual inspection time, after the completion of this maintenance work, the project will face the test of long-term operation conditions of "one and a half years" for the first time. Digitization will provide important impetus for the continuous operation of the Lingshao DC project.

Recommend

安貝斯_穎兒

027-86578008

在線咨詢

又大又粗插小骚无码视频| 老司机免费福利午夜入口| 男操女插插插痛免费下载| 日韩精品一区二区视频在线| 国产 高清 欧美 日韩| pkf女尸av| 国产AV不卡区| 日本操骚逼网站| 免费少妇a级毛片人成网| 成人福利短视频在线观看| 国产av精品综合色一区| 男人插入女人下面的视频| 作爱激烈叫床视频大尺度| 春药刺激国产老富婆露脸| 啪啪高潮激烈喷水动态图| 国产精品久久久国产a级| 色婷婷国产一二三区大香蕉| 精品国产一区二区999| 国产乱淫视频| 伊人是香蕉大人国产达人| 国产高颜值露脸高潮专区| 亚洲孕天码区二区三区久久 | 用我要灬我要灬我要灬造| 杨幂性XXXXHD国产| 注射器抽奶操逼挤奶操逼| 污污污的涩涩的tv在线| 秋霞午夜鲁丝片午夜精品| 成年人尤物视频在线观看| 逼逼被爆操视频| 欧美高潮喷水| 亚洲高清一二区二区三区| 久久久久国产精品嫩草院| 免费在线观看日韩精品视频| 和美女裸战小穴| 午夜18禁a片免费网站| 日韩亚洲国产欧美在线观看| 日韩毛片免费看美日韩毛片| 亚洲国产精品无码第一区| 91偷拍与自偷拍亚州精品| 人妻888久久中文字幕| 爆操女逼小黄片|